525m new cycleway along Hornibrook Esplanade, Clontarf to create a high-quality separated cycling facility to safely separate pedestrians and high-speed groups of cyclists exiting the Hornibrook Bridge.
Archives: Project
Young and Oakey Flat Road Intersection, Narangba
Projex Partners alongside Venant Solutions provided drainage design and flood modelling for Young and Oakey Flat Road Intersection, Narangba
Bruce Highway South of Back Creek Range
Options Analysis and Detailed Design for the Wide Centre Line Treatment (WCLT) project for 2.4km of the Bruce Highway between Gin Gin and Benaraby.
The project includes multiple overtaking lanes and intersections plus sections requiring extended design domain assessment.
Mooloolah River Dredging
Preparation of a tidal works application that supports the proposed maintenance dredging of the Mooloolah River between Mooloolah Island and Outrigger Park by Sunshine Coast Council.
National Storage, North Lakes
These self-storage units comprised two large buildings. The smaller 4000m2 floor space structure (incl. upper and lower floors).
Emerald Court, Mapleton – Surface and Subsurface Drainage Design
Design, documentation, and civil construction certification of subsurface and surface drainage within Council’s reserve at Emerald Court, Mapleton.
Mango Hill – Halpine Lake Pathway and Pedestrian Bridge & Placemaking – Detailed Design
400m of connection shared pathway between Mango Hill Station and Jasper Place, Mango Hill. The project connected a missing link in the shared pathway network and has reactivated a park area for the community.
A link to the project is here:
https://www.moretonbay.qld.gov.au/Services/Projects/Halpine-Lake-Reserve
Peer Review MILVEHCOE (Military Vehicle Centre of Excellence)
Independent engineering review for the site infrastructure of this $200M project on behalf of the construction contractor.
Jessica Park Pond Remediation, Kawana
Investigation and design of the existing pond function including remediation, to improve playing area within the park, improve water quality and a reduced ongoing maintenance costs to Sunshine Coast Council for pond maintenance.
Bruce Highway (10G and 10H Road Safety Improvements)
Detailed design of 6 intersection upgrades, 2.4km of Wide Centreline Treatment, 3 rest areas and approximately 60km of roadside hazard improvement works north of Mackay.