Projex Partners long term client Beenleigh Steel Fabrications engaged us to work closely with their architect to design the purpose built, state of the art steel fabrication warehouse located on the outskirts of Brisbane. The main warehouse with separate office building has been designed to express the clients core business of steel fabrication and has been achieved through exposed external steel framing, raking ceilings with exposed trusses and hanging high bay lights with exposed AC feature ductwork all to keep the industrial aesthetic. Four gantry cranes (10T/20T) including a twenty ton dolly on rails cast into the warehouse slab ensure the facility is future proofed and fit for operational purposes. Projex Partners was extremely pleased to have completed structural and civil engineering design for the project.
Architectural renderings by Greg Everding Architect.
Archives: Project
Rochedale South State School Multi-Purpose Hall
The Performing Arts Centre Hall provides Rochedale South State School with space for pupils to engage with the arts and creativity. Engaged by Watpac to complete the structural and civil design aspects of the project, Projex Partners worked collaboratively with the consultant team to investigate various framing options resulting in the 22m single span, mono-slope, portal frame structure. The foundation system consists of a suspended concrete slab supported on screw piles at regular centres, cast over a void former to combat the challenging ground conditions.
Pedestrian Crossing Safety Review, Noosa Shire
Safety Assessment/Review of all Pedestrian Priority (zebra) Crossings across the Noosa Shire.
Bribie Island Recreation Reserve Netball Courts
Engineering services for the reconstruction of three existing lit netball courts, construction of a new clubhouse, construction of compliant pathways, construction of a rebound training wall and a construction of a boundary fence. The project included geotechnical design, services design and lighting design.
Sippy Downs Pedestrian Facilities Investigation
Projex Partners developed a detailed study methodology to measure existing pedestrian movement demand, developed forecast models relating to new adjacent commercial development and generated infrastructure enforcements and associated design for management of pedestrian and other passive facility users.
Mary Valley Rattler Railway Restoration
Project management and Advisor to Superintendent (Gympie Regional Council) for the Mary Valley Rattler Railway Restoration Construction Contract.
This project was triggered as a disaster recovery project after large sections of the rail line between Mary Valley & Imbil was severely damaged. Sections of the track were displaced, completely undercut and damage had occurred to bridges. Projex Partners role provided Project management and administration of the contract and Supervision for the restoration works of 23 km of railway infrastructure including 15 timber bridges.
Kilkivan Equestrian Centre
Contract administration for the construction of the Kilkivan Equestrian Centre. Works involved the brief for the design and tender documentation., tender review and assessment.
Huon Aquaculture Whale Point
Structural design services for the modular tank system used for the 20 tanks at this project. The project came into service just after Huon Aquaculture Co-Founders, Peter and Frances Bender were jointly recognised as the 2018 Australian Farmer of the Year.
This is the first Australian land-based salmon farm.
North QLD Stadium Peer Review
Independent analytical studies were carried out by Projex Partners to verify the structural adequacy, performance and to provide advice on structural and civil design optimisation to provide input to structural alternatives and optimisation in conjunction with the project engineering consultant.
Samford Road Shared Pathway & Bikeway Bridge – Ferny Hills
Structural design and documentation of the Samford Road Ferny Hills Cycle and Pedestrian pathway bridge.