45.92km rural road upgrade within Isaac Regional Council to accommodate increased heavy vehicle loading and improve flood immunity, safety and reliability.
The design included the upgrade and introduction of 9 culvert structures, 13 floodway structures and longitudinal drainage structures for the project.